enercon industries Enercon Industries


1.262.255.6070 
enercon corona, plasma, flame surface treating systems      
Timer
About Us  |  Products  |  Support  |  Library  |  Resources  |  Contact Us  |  Home
  Support > Treating Stations
 
About Us
Products
Support
Application Support
Support FAQ
Maintenance Tips
Compak 2000
Compak 9000
Power Lok II
Treating Stations
Electrode Air Gap Adjustment
Electrodes will not pivot freely
Station Faults
Return Procedures
Warranty Registration
Training
Library
Resources
Contact Us
Home

Electrodes will not pivot freely

The following is a description of an electrode assembly which will not pivot freely on an Enercon surface treating system.

Electrodes will not pivot freely
Symptom, Fault
Symptom The electrode assemblies don't pivot freely which results in broken electrodes or the electrode assembly has to be moved back into the treat position.
Fault There are a few possible causes for this problem.
   
Solutions
  1. The collar which provides the electrode position indication for the interlock circuit is binding at the bearing housing. (Item 7) NOTE! - The collar is on both ends, but the interlock switch is only installed on one end.
    1. Loosen the 3 sets of screws and reposition the collar away from the bearing housing.
    2. Ensure the interlock functions properly when repositioned.
  2. The electrode bearings may be binding due to misalignment, the bearing may be cocked in the housing. (Item 6)
    1. Loosen the electrode position indication collar on each end of the electrode assembly. (Item 7)
    2. Force the electrode assembly in the direction of the high voltage transformer end. The pressure applied will force the bearing to seat correctly on the assembly tube.
    3. Force the electrode assembly in the opposite direction.
    4. Readjust the electrode position indication collars.
    5. Verify the interlocks function properly.
  3. The bearing may require cleaning. Follow the step by step procedure below.
    1. Disconnect the electrodes at the high voltage terminal block and remove them from the assembly.
    2. Remove the electrode interlock switch and the ground strap.Disconnect the pneumatic tubing from the air cylinders.
    3. Remove the screws (1) from the electrode adjusting blocks (2) and remove the blocks (on both ends).
    4. Remove the adjustment stud (3) and holding socket head screw (4).
    5. Slide the assembly out of the station.
    6. Remove the bearing seals before removing the bearing housings (5) from the exhaust tube.
    7. To clean, the whole bearing housing can be soaked in a solvent to remove any contaminates. If replacing a bearing (6), carefully remove it from the housing. Ensure the housing does not get damaged.
    8. Regrease the bearings with a multipurpose lithium grease.
    9. Reinstall the housing on the exhaust tube and the bearing seals.
    10. Reinstall the assembly in the station.
    11. Reinstall the adjustment stud and the holding socket head screw.
    12. Reinstall the electrode adjustment blocks.
    13. Reconnect the pneumatic tubing to the air cylinders.
    14. Reconnect the interlock switch and ground strap.
    15. Reinstall the electrodes and reconnect them to the high voltage block.
    16. Set tilt, gap, and adjust electrode interlock switch for proper operation.
About Us | Products | Support | Library | Resources | Contact Us | Home

Copyright © 1996-. Enercon Industries Corporation.
All rights reserved. Do not duplicate or redistribute in any form.